Double Girder Overhead Travelling Cranes
High-capacity overhead crane for heavy and frequent lifting
Double girder overhead travelling cranes run a hoist trolley on top of two main girders to lift heavy loads safely in wide-span, high-bay facilities. LIFTKON calculates and builds every crane for your building, load and duty class at its plant in Konya, Türkiye.
A double girder overhead crane (double girder EOT crane) consists of two main girders travelling on runway rails along the building and a hoist trolley running on top of those girders. Because the trolley runs above the girders, it achieves higher lifting capacity and greater hook height than single girder systems. That makes it the first choice for wide-span production and storage areas where heavy loads are lifted frequently.
Design and construction
Bridge girders are sized according to DIN and FEM principles for the crane's duty class. The trolley rail on the girder is either solid square bar or A-type crane rail. A full-length maintenance walkway is provided on at least one girder for service work, and the power supply and cable festoon are routed between the girders for protection. End carriages are designed to transmit the lowest possible loads to the runway and the building. Lifting is handled by the LIFTKON double girder crane trolley and long travel by the bridge travel drive unit.
Controls and safety
The crane can be operated by pendant, radio remote control or a fixed or travelling operator cabin. An overload protection unit, hoist and travel limit switches, emergency stop and brakes are standard. If required, load cell data is shown on a display so the operator sees the actual load.
Why a custom-engineered crane?
Capacity, span, lifting height, speeds and duty class differ in every facility. LIFTKON engineers review your building and workflow and calculate the crane accordingly; manufacturing, installation, load testing and commissioning are handled by one team. See delivered projects on our references page or request a quote.
Advantages
- High capacity and hook heightThe trolley runs on top of the girders, giving more lifting height in the same building and suiting heavier loads.
- Suited to wide spansThe two-girder structure limits deflection on wide bays and keeps the crane stable.
- Easy maintenanceFull-length walkway and protected power line between the girders.
- Low loads on the buildingEnd carriages are designed to minimise loads on the runway and structure.
- Single-source projectEngineering, manufacturing, installation, testing and after-sales service by LIFTKON.
Applications
- Machine buildingHandling heavy parts, moulds and assemblies.
- Steel and metal processingPlate, section, coil and heavy product storage.
- Power plantsTurbine, generator and maintenance work.
- Mining and port facilitiesHeavy equipment and material handling.
- Factories, warehouses and workshopsHigh-bay indoor areas with wide spans.
Industries
Options
- Radio remote controlThe operator works at a safe distance with a clear view of the load.
- Operator cabinFixed or travelling with the bridge.
- Load displayShows load cell data.
- Variable speed drives (inverter)Soft start/stop and precise positioning.
- Underhung designSuspended from the roof structure on I-beams.
Safety
- Overload protection unit
- Hoist and travel limit switches
- Emergency stop and main isolator
- Hoist and travel brakes
- Warning light and siren