Çift Kiriş Gezer Vinç Arabası

Double Girder Crane Trolley

Hoist unit for double girder overhead cranes

The double girder crane trolley is the main mechanism that hoists the load and traverses the bridge. LIFTKON designs and builds it with a dismountable structure, AISI 1045 wheel blocks and high safety factors.

The double girder crane trolley (hoist unit) runs on the two girders of the bridge and lifts the load. It is the most critical component of an overhead crane. It can be supplied on its own for new crane projects, crane refurbishments or capacity upgrades.

Structure

LIFTKON trolleys are designed and manufactured in line with European standards. Their dismountable structure means every part can be removed individually during maintenance, repair or modification. The hoisting and traversing drives are LIFTKON's own design.

Wheels and travel system

A rocker (cradle) system and balancing arrangement ensure the wheels sit fully on the rails. Wheel blocks are machined from AISI 1045 steel, offer noise damping and high bearing performance, and tolerate centre misalignments of up to ±20 mm.

Safety

A safety factor of 1.2 applies to the hoist unit and 2 to the braking system. The trolley is fitted with overload protection, hoist limit switches and a rope guide.

Request a quote with capacity, lifting height and rail gauge.

Advantages

  • Dismountable structureEvery part can be removed; easy maintenance and modification.
  • AISI 1045 wheel blocksTolerate up to ±20 mm centre misalignment.
  • High safety factors1.2 on the hoist unit, 2 on the brakes.
  • Designed to European standards

Applications

  • New double girder overhead cranes
  • Gantry and semi-gantry cranes
  • Crane refurbishment and capacity upgrades

Industries

Options

  • Variable speed drives (inverter)For hoisting and traversing.
  • Auxiliary hoist (second hook)
  • Load display

Safety

  • Overload protection unit
  • Upper/lower hoist limit switches
  • Rope guide
  • Hoist and travel brakes

Gallery

Frequently asked questions

Can I buy the crane trolley on its own?
Yes. We build trolleys to suit your existing bridge dimensions and capacity.
Can I upgrade my crane's capacity by replacing the trolley?
The bridge and runway must be verified by calculation for the new load; if suitable, a trolley replacement can raise capacity.
Which standards are the trolleys built to?
They are designed and manufactured in line with European standards.

Share the technical data of your project

Send us capacity, span and operating conditions — our engineering team will prepare the right solution.