Vinç İndikatör — parça şeması (LIFTKON çizimi, ürün fotoğrafı değildir)

Crane Load Indicator

Shows the operator the lifted load in real time

The crane load indicator displays data from the overload sensor so the operator sees the lifted load in real time.

A crane load indicator transfers data from the load cell in the hoisting system to a display the operator can see. Seeing the weight at the moment of lifting, the operator notices when the crane approaches capacity; the reading can also be used for dispatch and stock tracking.

Application

The display can be a large screen on the bridge, in the operator cabin or on the screen of the radio remote control. Working with the overload protection unit, it provides both indication and protection.

To add a load display to your existing cranes, submit a service request or request a quote.

Selection and application

The data that drive the selection of a Crane Load Indicator are the crane’s capacity, the number of motions (hoist, trolley, bridge), supply voltage, control type and working environment. In dusty, humid or outdoor applications the protection class is assessed separately. Where variable speed is required, the drive is selected together with motor power and the number of cycles.

LIFTKON uses this equipment on new cranes and in the electrical refurbishment of existing ones. For a retrofit the crane make, capacity, motor ratings and the existing panel or control details are needed; a photograph of the nameplates is usually enough. It can be attached to the quotation form, and installation and commissioning can be included in the scope.

Advantages

  • Real-time load data
  • Integrated with overload protection
  • Flexible display positions

Applications

  • Overhead and gantry cranes
  • Dispatch and stock tracking

Options

  • Large displayReadable from a distance.

Frequently asked questions

Does a load indicator protect the crane?
The indicator shows the load; protection is provided by the overload protection unit. They are used together.
What is the selection based on?
Crane capacity, the number of motions (hoist, trolley, bridge), motor ratings, supply voltage and the working environment. In dusty or outdoor applications the protection class is assessed separately.
Can the electrics of our existing crane be renewed?
Yes. The crane make, capacity, motor ratings and the existing panel or control details are needed; photographs of the nameplates are usually enough.
Can variable speed control be added?
It can. The drive is selected together with motor power, travel distance and daily cycles; soft starting also protects the load and the structure.

Share the technical data of your project

Send us capacity, span and operating conditions — our engineering team will prepare the right solution.