Modernization

Capacity upgrades, control system renewal and safety improvements for your existing cranes.

Modernizasyon — süreç şeması (LIFTKON çizimi)

Older cranes can be made safer and more efficient without buying a new crane. The scope of modernization is determined after checking the suitability of the existing bridge and runway.

  • Hoist unit renewal and capacity upgrade
  • Control renewal with frequency inverter drives
  • Adding radio remote control
  • Overload protection and limit systems

Share the technical data of your project

Send us capacity, span and operating conditions — our engineering team will prepare the right solution.