Transformer manufacturing plants
Precise, high-capacity cranes for core, winding and tank assembly in transformer manufacturing plants.
In transformer manufacturing, core stacking, winding assembly, lowering the active part into the tank and moving the unit to the test area are done by crane. Lowering the active part into the tank is both a heavy and a very delicate operation.
Twin-hook trolleys and synchronised cranes ensure balanced handling of large transformers.
Recommended cranes and equipment for transformer manufacturing plants
- Double Girder Overhead Travelling Cranes
- Single Girder Overhead Travelling Cranes
- Double Girder Crane Trolley
Engineering and service
For transformer manufacturing plants, LIFTKON engineers the crane system according to on-site measurements, the load profile and the intensity of use, and handles manufacturing, installation, commissioning and periodic maintenance from a single source. To receive a quotation, simply share the capacity, span and lifting height.
Lifting requirements in this industry
- Lowering the active partVery slow, stable movement.
- Large transformersSynchronised cranes or twin hooks.
- AssemblyLight cranes for core and winding work.
Products for this industry
Share the technical data of your project
Send us capacity, span and operating conditions — our engineering team will prepare the right solution.



