Steel structure fabrication plants
Wide-span overhead travelling cranes for section, beam and column fabrication in steel structure plants.
In steel structure fabrication, every station from section cutting to welding and painting is fed by crane. In large bays, several cranes running on the same runway and synchronised handling of long members are common.
Twin-hook solutions are planned for turning members during welding, and high-capacity cranes for dispatch.
Recommended cranes and equipment for steel structure fabrication plants
- Double Girder Overhead Travelling Cranes
- Single Girder Overhead Travelling Cranes
- Lifting Beam
- Double Girder Crane Trolley
Engineering and service
For steel structure fabrication plants, LIFTKON engineers the crane system according to on-site measurements, the load profile and the intensity of use, and handles manufacturing, installation, commissioning and periodic maintenance from a single source. To receive a quotation, simply share the capacity, span and lifting height.
Lifting requirements in this industry
- Member turningTwin-hook trolley for welding.
- Synchronised operationTwo cranes together on long members.
- Large baysLong-span double girder cranes.
Products for this industry

Double Girder Crane Trolley
Hoist unit for double girder overhead cranes

Double Girder Overhead Travelling Cranes
High-capacity overhead crane for heavy and frequent lifting

Single Girder Overhead Travelling Cranes
Economical overhead crane for low-headroom and narrow-bay buildings

Lifting Beam
Safe crane handling of long and unbalanced loads
Share the technical data of your project
Send us capacity, span and operating conditions — our engineering team will prepare the right solution.
